Rockford Fosgate RFK4 4 AWG Power Installation Kit

 

Buy 2 or more and pay each × each Save %
Total · you save
Rockford Fosgate
Part no RFK4
Ascent part no 813126
Loading...
The Rockford Fosgate RFK4 is a 4 AWG power installation kit designed for amplifier setups. It includes 17 feet of 4 AWG power wire, 3 feet of 4 AWG ground wire, a Maxi fuse holder with a 100 Amp fuse, and appropriate wire termination hardware. The cables are made from 100% Pure Crystal-Oxygen Free Copper (PC-OFC), meet or exceed AWG requirements, and feature 1,862 strands in a 21.1mm² cross-section for optimal performance and reliability.

Technical Specifications

Product NameRockford Fosgate RFK4 4 AWG Power Installation Kit
ManufacturerRockford Fosgate
Model NumberRFK4
Product CategoryMiscellaneous kits
CABLE SPECIFICATIONS
Power Wire Length17 feet
Power Wire Gauge4 AWG (21.1mm², 1,862 strands)
Ground Wire Length3 feet
Ground Wire Gauge4 AWG
Material100% Pure Crystal-Oxygen Free Copper (PC-OFC)
AWG ComplianceMeets or exceeds American Wire Gauge requirements
FUSE
Fuse TypeMAXI
Fuse Rating100 Amp
Fuse HolderIncluded (AFS/MAXI compatible)
INSTALLATION
Battery PWR/GND Gauge4 AWG
Amplifier PWR/GND Gauge4 AWG
Speaker Wire GaugeN/A
Dual Amp Installation KitNo

Downloads

Please read our terms and conditions. We try very hard to make sure the specification and images on this page are accurate, but occasionally (and thankfully rarely) mistakes do happen. If you discover the product delivered is not as described, please let us know as soon as possible after delivery so we can correct the mistake and arrange for the product to be returned.

Rockford Fosgate
Part no RFK4
Ascent part no 813126
  • Free NZ deliveryNo hidden fees
  • 100% Kiwi owned34 years in business
  • Net Promoter Score 94Rated by our customers
Questions? (04) 802 3890


"I called in Ascent after another, lower-cost option just straight-up lied...on component availability. After a month of BS, I cancelled with them, went to Ascent, paid a bit more, and had th" ... Hazel, 10 November 2026
More feedback